Skip to main content

Pricing

Pricing that respects your contract calendar.

Fixed-fee on most engagements. Hourly only when scope is genuinely undefined. No retainer games, no scope-creep surprises.

Engagement tiers

Three tiers. Fixed-fee. Right-sized to the job.

Most projects fit cleanly into one of three lanes. We quote off the lane that matches your scope, not off a per-square-foot rate sheet.

TIER.01

Schematic

Starting at $2,500

Fixed-fee · 1–2 weeks

ADUs, additions, simple residential, owner-builder pre-permit clarity.

  • Schematic floor plan
  • Exterior elevations (4)
  • Basic site plan
  • Code-strategy memo
  • 1 revision round
  • Phoenix overlay flag list

RECOMMENDED

TIER.02

Permit-Ready

Starting at $8,500

Fixed-fee · 3–5 weeks

Custom homes, full residential, small commercial tenant improvements.

  • All Schematic deliverables
  • Structural coordination
  • MEP coordination
  • IECC 2024 compliance path
  • Permit submittal package
  • 2 revision rounds
  • AHJ Q&A liaison
  • Plan-check correction responses

TIER.03

Full Documentation

Starting at $22,500

Fixed-fee or hourly at $145/hr · 6–12 weeks

Multifamily, mid-rise commercial, complex code analysis, phased work.

  • All Permit-Ready deliverables
  • Complete construction set
  • Specifications (CSI MasterFormat)
  • Bidding-phase support
  • RFI response during construction
  • As-built coordination
  • Sub-consultant management
  • Quarterly cost-impact reports

Add-ons

Common add-ons.

Priced per scope at quote time. Most add 5–20% on top of the base tier. We tell you the number before you commit.

3D rendering

Photorealistic exteriors and key interior shots. Two revisions included.

Expedited turnaround

Compressed schedule with weekend hours. Subject to studio capacity.

After-hours availability

Off-hours phone + portal response for tight construction calendars.

Spanish documentation set

Full bilingual title block, sheet notes, and shop drawings.

Change orders

Clean change-order packages with sign-off and as-built deltas.

RFI batch service

Construction-phase RFI batching with same-day weekday response.

What’s not included

We tell you what we don’t do.

We do not stamp structural, MEP, or civil — those need licensed engineers and we keep that work in the engineers’ hands. We coordinate sub-consultants for you and pass through their fees at cost, with no markup. The same applies to surveys, soils reports, and specialty consultants. You see every invoice. We are happy to recommend the engineers we trust most in the Valley.

FAQ

Common questions before you commit.

How do you charge?

Fixed-fee on roughly 80% of engagements — Schematic, Permit-Ready, and most Full Documentation jobs are quoted as a single number with milestones. We use hourly ($145/hr) only when the scope is genuinely undefined, like exploratory feasibility work or open-ended code research.

What about revisions?

Schematic includes one revision round. Permit-Ready includes two. Full Documentation is generally three plus all plan-check correction cycles. Beyond that, revisions are billed hourly at $145/hr against a written change order — never a surprise invoice.

Do you require a deposit?

Yes — typically 25% to start, 50% at schematic milestone, balance at permit submittal. We use Stripe and ACH inside the client portal. No checks unless you really want to.

Can you work outside Arizona?

We do remote work for projects in CA, NV, and NM where the code path is well-understood. We will not take a project where we cannot speak credibly to the local AHJ — that is a recipe for permit delay and we tell you when it is the case.

Are bilingual deliverables an extra fee?

Project communication, intake, contracts, and the client portal are bilingual at no extra charge — that is how we run the studio. A fully translated documentation set (sheet notes, specs, shop drawings) is an add-on because it adds drafting hours.

Contact

Begin a project.

Studio

Phoenix1234 N Central Ave · Phoenix, AZ 85004 [TBD]

Servicios disponibles en español. (623) 555-0100 [TBD]

Pricing — Fixed-Fee Architectural Drafting · Archipartners Design