Skip to main content

ServiceMEP.06

MEP coordination

We don’t stamp MEP — we coordinate it. Sub-consultant management, conflict detection.

What we do

MEP is the most common drafting failure point. We don’t stamp MEP — we coordinate it. We size loads to a Manual J/D/S level of confidence, write the scope for the engineer, run conflict detection between architectural and MEP backgrounds, and hand the GC a set that actually builds.

  • Manual J/D/S load sizing and HVAC narrative
  • Coordinated sub-consultant scope writing
  • Conflict detection on architectural backgrounds
  • IECC 2024 climate zone 2 compliance pathway

What you get

  • Architectural background ready for MEP drafting
  • Load sizing summary and HVAC narrative
  • IECC compliance worksheet
  • Plumbing fixture-unit count and gas demand
  • Electrical service-size calc and panel schedule scope
  • Conflict-detection report on the merged set

Phoenix specifics

Climate zone 2 in AZ means cooling-dominated load profiles and tight envelope thresholds under IECC 2024. We pick the prescriptive vs. performance path that minimises corrections, and we know which mechanical engineers in town are fast vs. thorough — we partner accordingly.

Pricing

Typical engagement: $2,500–$9k. Fixed-fee on most projects.

MEP COORDINATION

Wrangling MEP sub-consultants? We'll coordinate.

Contact

Begin a project.

Studio

Phoenix1234 N Central Ave · Phoenix, AZ 85004 [TBD]

Servicios disponibles en español. (623) 555-0100 [TBD]

MEP coordination — Phoenix architectural drafting · Archipartners Design