我们的工作方式
固定费用
动笔前报价
规范分析页
每套图纸开篇
免费修正
我方图纸中的错误
50州
承接项目范围
EN · ES · 中
语言
我们做什么
翻新单个公寓或共管单元,且不改动任何墙体?我们准备申报图纸,并跟进城市审查。城市要求的任何工程设计,由独立的注册工程师完成并盖章。涉及多个单元或改动任何墙体的工程,我们不承接,而是转介给注册建筑师:亚利桑那州法律限制未注册公司可以准备的图纸范围。
- 改动单元的规范分析:使用类别、出口与改造所需的无障碍
- 现状、拆除与改造后平面图
- 单元的暖通、电气与给排水图
- 改动部分的节能规范合规
您得到什么
- 附规范分析图页的申报图集;城市要求的工程部分由独立注册工程师完成并盖章
- 现状与拆除平面图
- 改造后平面图与反映吊顶图
- 电气图、配电盘表与负荷计算
- 门、窗与饰面表
- 对审图意见中属于我方范围事项的回复,已包含
当地细节
凤凰城规划与发展局(PDD)把单元翻新作为改造工程审查:首页的规范分析列明使用类别、建造类型、出口以及改造所需的无障碍。我们为每个城市维护一份核对清单,内容来自审图员实际发给我们的修改意见。
报价
单个公寓单元内、不移动墙体的工程:$9,350 起,MEP 工程另计。更大的工程需要注册建筑师 —— 我们会为您转介。
问答
常见问题
What size of apartment job do you take?
One unit, with no wall changed: renovation work inside a single apartment or condo unit. More than one unit, or any wall changed, goes to a registered architect — we refer you to one instead of taking it.
Do you stamp drawings?
No — we are a drafting studio, not a registered architecture or engineering firm, and we never apply a seal. Where a project needs an engineer’s seal, an independent engineer registered in your state is responsible for that part of the work: they prepare it, or directly supervise its preparation, and seal it. Engineering and seals, where your city requires them, are separate lines on your quote, so there are no surprises. If a project needs a registered architect, we refer you to one instead of taking it.
Do you submit permits on my behalf?
Yes — for an itemized fee, we file the permit package directly with the AHJ, handle correction cycles, and shepherd the set through to issuance. Or you can take the finished set and submit it yourself. Your call; either way, the drawing scope is the same.
What is your revision policy?
Every fixed-fee quote includes two rounds of revisions before construction documents are finalized. On a standard quote, our answers to the city’s comments on items in our scope are included, and if the city flags an error in our drawings, we fix it free. Substantive scope changes after CD freeze are quoted separately, as a fixed price, before the work starts.
Can you work with my existing GC, engineer, or interior designer?
Yes. We routinely coordinate with general contractors, structural / MEP engineers, kitchen designers, and interior designers your team has already retained. We work in their CAD format, attend their coordination meetings, and produce drawings that bid cleanly against their scope.
How fast can you turn around a set?
A Permit-Ready set typically takes 4–6 weeks from a complete brief. Your delivery date is in writing on the quote.
What languages do you work in?
This website is in English, Spanish, and Chinese, and your proposal, agreement, estimates, and invoices can also be shown in Chinese (the English version governs). We can issue drawing sets bilingually if your trade contractors prefer Spanish — useful in Phoenix, Las Vegas, and Texas markets.
What insurance do you carry, and who is responsible if a drawing error causes a problem during construction?
We carry general liability insurance, and we re-cut any drawing issue we caused at no charge. Because we are a drafting studio, any sheet that needs an engineer’s seal is prepared or directly supervised, and sealed, by an independent registered engineer who carries their own professional (errors-and-omissions) liability for that work. Ask us for our certificate of insurance before you sign.
Do I own the drawings, and can I get the editable CAD files?
You receive the permit-ready set you paid for, and your contract spells out your rights to the files. If you need the native, editable CAD (DWG) — to hand to a builder, a sub, or another firm — tell us during intake so we confirm the deliverable format up front rather than at handoff.
What do you need from me to get started, and how much is the deposit?
To quote, we need your project basics: the location or parcel, your scope, and any survey, existing plans, or even a rough sketch. Engagements start with a deposit at contract signing — paid by card, ACH, or check through the client portal — with the balance tied to project milestones. You do not need an architect's drawings to begin; we work from a napkin sketch or pick up an architect's earlier design.
Can you tell me what my project will cost to build, not just to draw?
We don't quote construction costs — that's your general contractor's bid, and it depends on finishes, site conditions, and the current local labor and material market. We design to a clear, complete scope so your GC can price it tightly with fewer surprises, and we can connect you with GC partners for a build estimate.
公寓与共管单元
