跳到主内容

服务 · PMT.02

申报加速

IBC/IRC/IECC 规范审查、审图回复、与审图机构联络。

我们的工作方式

  • 固定费用

    动笔前报价

  • 规范分析页

    每套图纸开篇

  • 免费修正

    我方图纸中的错误

  • 50州

    承接项目范围

  • EN · ES · 中

    语言

我们做什么

您有图集。您有修改清单。您没时间。我们接手,撰写审图员想看到的回复叙述,按其格式标注图页,然后亲自跟进重新提交。专精全美各州修订与本地叠加规范。

  • 审图修改回复,书面与图示
  • 与审图机构联络 — 我们认识审图员
  • 专精凤凰城叠加规范与地方修订
  • 重新提交全程跟进,已包含

您得到什么

  • 逐条书面回复叙述
  • 按审图员意见标注的图页
  • 注明章节号的规范引用
  • 可提交的重新提交包
  • 引导至正确审图员队列
  • 许可签发后的关闭报告

当地细节

我们为凤凰城规划与发展局、Maricopa 县、Mesa、Tempe、Scottsdale、Chandler、Glendale、Gilbert、Surprise 的队列准备图集,并为每个城市维护一份核对清单,内容来自审图员实际发给我们的修改意见。

报价

固定费用,在我们读过修改意见书后报价。

问答

常见问题

  • Which building departments do you prepare sets for?

    Any U.S. building department — we take projects in all 50 states. Our home base is Phoenix, and for each city we keep a checklist built from the correction comments its reviewers have actually sent us. A job outside the Phoenix metro adds $550 to the quote, and with a building department new to us we check its submittal portal and correction format first rather than guess.

  • How fast is "permit expediting"?

    We can't make the AHJ review faster — what we do is keep the package clean enough to avoid corrections, and answer them item by item when they come. We track the AHJ's queue and follow up on day 1 of every published turnaround.

  • What happens if my permit gets rejected on first review?

    On a standard quote, our answers to the city’s comments on items in our scope are included, and if the city flags an error in our drawings, we fix it free. The only extras are if the AHJ asks for substantive new scope (e.g., adds a structural review requirement that wasn't in the original) — those are quoted separately, transparently.

  • Do you stamp drawings?

    No — we are a drafting studio, not a registered architecture or engineering firm, and we never apply a seal. Where a project needs an engineer’s seal, an independent engineer registered in your state is responsible for that part of the work: they prepare it, or directly supervise its preparation, and seal it. Engineering and seals, where your city requires them, are separate lines on your quote, so there are no surprises. If a project needs a registered architect, we refer you to one instead of taking it.

  • Do you submit permits on my behalf?

    Yes — for an itemized fee, we file the permit package directly with the AHJ, handle correction cycles, and shepherd the set through to issuance. Or you can take the finished set and submit it yourself. Your call; either way, the drawing scope is the same.

  • What is your revision policy?

    Every fixed-fee quote includes two rounds of revisions before construction documents are finalized. On a standard quote, our answers to the city’s comments on items in our scope are included, and if the city flags an error in our drawings, we fix it free. Substantive scope changes after CD freeze are quoted separately, as a fixed price, before the work starts.

  • Can you work with my existing GC, engineer, or interior designer?

    Yes. We routinely coordinate with general contractors, structural / MEP engineers, kitchen designers, and interior designers your team has already retained. We work in their CAD format, attend their coordination meetings, and produce drawings that bid cleanly against their scope.

  • How fast can you turn around a set?

    A Permit-Ready set typically takes 4–6 weeks from a complete brief. Your delivery date is in writing on the quote.

  • What languages do you work in?

    This website is in English, Spanish, and Chinese, and your proposal, agreement, estimates, and invoices can also be shown in Chinese (the English version governs). We can issue drawing sets bilingually if your trade contractors prefer Spanish — useful in Phoenix, Las Vegas, and Texas markets.

  • What insurance do you carry, and who is responsible if a drawing error causes a problem during construction?

    We carry general liability insurance, and we re-cut any drawing issue we caused at no charge. Because we are a drafting studio, any sheet that needs an engineer’s seal is prepared or directly supervised, and sealed, by an independent registered engineer who carries their own professional (errors-and-omissions) liability for that work. Ask us for our certificate of insurance before you sign.

  • Do I own the drawings, and can I get the editable CAD files?

    You receive the permit-ready set you paid for, and your contract spells out your rights to the files. If you need the native, editable CAD (DWG) — to hand to a builder, a sub, or another firm — tell us during intake so we confirm the deliverable format up front rather than at handoff.

  • What do you need from me to get started, and how much is the deposit?

    To quote, we need your project basics: the location or parcel, your scope, and any survey, existing plans, or even a rough sketch. Engagements start with a deposit at contract signing — paid by card, ACH, or check through the client portal — with the balance tied to project milestones. You do not need an architect's drawings to begin; we work from a napkin sketch or pick up an architect's earlier design.

  • Can you tell me what my project will cost to build, not just to draw?

    We don't quote construction costs — that's your general contractor's bid, and it depends on finishes, site conditions, and the current local labor and material market. We design to a clear, complete scope so your GC can price it tightly with fewer surprises, and we can connect you with GC partners for a build estimate.

申报加速

卡在审图阶段?我们帮您解套。

一个工作日内回复 · 固定报价

联系

开始一个项目。

工作室

Phoenix4435 E Chandler Blvd · Suite 200

提供英语 · 西班牙语 · 中文服务。 (602) 628-1231

申报加速 — 制图与报建 · 全美50州 · Archipartners Design