我们的工作方式
固定费用
动笔前报价
规范分析页
每套图纸开篇
免费修正
我方图纸中的错误
50州
承接项目范围
EN · ES · 中
语言
我们做什么
MEP 是制图最常见的失败点。城市要求 MEP 工程师时,由工程师设计并盖章;我们绘制布置图,为工程师撰写工作范围,在建筑底图与 MEP 之间做冲突检测,交给总承包商一份能真正建出来的图集。
- Manual J/D/S 负荷计算与 HVAC 叙述
- 为MEP工程师撰写工作范围
- 建筑底图上的冲突检测
- IECC 2024 合规路径
您得到什么
- 可供 MEP 制图的建筑底图
- 负荷计算汇总与 HVAC 叙述
- IECC 合规工作表
- 给排水固定单位计数与燃气需量
- 电气服务规模计算与配电板表范围
- 合并图集上的冲突检测报告
当地细节
气候区 2B(凤凰城与图森地区)意味着以制冷为主的负荷曲线和 IECC 下严格的围护结构阈值。我们选择能将修改最小化的规范路径或性能路径。
报价
已包含在我们的租赁改造与多户住宅图集中。单独委托时,按项目报固定费用。MEP 工程师的费用在报价中单独列项。
问答
常见问题
What does "MEP coordination" include exactly?
Coordinating mechanical (HVAC), electrical, and plumbing layouts between the trade engineers and the architectural set so nothing collides on site. We mark conflicts (a duct routed through a beam, a plumbing chase too small for the riser, a panel feeder that needs a new circuit), issue RFIs to the relevant trade, and incorporate resolved decisions into the architectural drawings.
Do you do MEP design from scratch, or only coordinate?
Both, depending on the project. Small commercial TI: where no MEP engineer's seal is required, we produce the permit-set MEP layouts; where one is, an independent registered MEP engineer prepares or directly supervises those sheets and seals them.
Can you join my project's coordination meetings?
Yes — typically a weekly 30-minute call during the active coordination phase. Included in the fee for projects we're producing the architectural set on; itemized on the quote for coordination-only engagements.
Do you stamp drawings?
No — we are a drafting studio, not a registered architecture or engineering firm, and we never apply a seal. Where a project needs an engineer’s seal, an independent engineer registered in your state is responsible for that part of the work: they prepare it, or directly supervise its preparation, and seal it. Engineering and seals, where your city requires them, are separate lines on your quote, so there are no surprises. If a project needs a registered architect, we refer you to one instead of taking it.
Do you submit permits on my behalf?
Yes — for an itemized fee, we file the permit package directly with the AHJ, handle correction cycles, and shepherd the set through to issuance. Or you can take the finished set and submit it yourself. Your call; either way, the drawing scope is the same.
What is your revision policy?
Every fixed-fee quote includes two rounds of revisions before construction documents are finalized. On a standard quote, our answers to the city’s comments on items in our scope are included, and if the city flags an error in our drawings, we fix it free. Substantive scope changes after CD freeze are quoted separately, as a fixed price, before the work starts.
Can you work with my existing GC, engineer, or interior designer?
Yes. We routinely coordinate with general contractors, structural / MEP engineers, kitchen designers, and interior designers your team has already retained. We work in their CAD format, attend their coordination meetings, and produce drawings that bid cleanly against their scope.
How fast can you turn around a set?
A Permit-Ready set typically takes 4–6 weeks from a complete brief. Your delivery date is in writing on the quote.
What languages do you work in?
This website is in English, Spanish, and Chinese, and your proposal, agreement, estimates, and invoices can also be shown in Chinese (the English version governs). We can issue drawing sets bilingually if your trade contractors prefer Spanish — useful in Phoenix, Las Vegas, and Texas markets.
What insurance do you carry, and who is responsible if a drawing error causes a problem during construction?
We carry general liability insurance, and we re-cut any drawing issue we caused at no charge. Because we are a drafting studio, any sheet that needs an engineer’s seal is prepared or directly supervised, and sealed, by an independent registered engineer who carries their own professional (errors-and-omissions) liability for that work. Ask us for our certificate of insurance before you sign.
Do I own the drawings, and can I get the editable CAD files?
You receive the permit-ready set you paid for, and your contract spells out your rights to the files. If you need the native, editable CAD (DWG) — to hand to a builder, a sub, or another firm — tell us during intake so we confirm the deliverable format up front rather than at handoff.
What do you need from me to get started, and how much is the deposit?
To quote, we need your project basics: the location or parcel, your scope, and any survey, existing plans, or even a rough sketch. Engagements start with a deposit at contract signing — paid by card, ACH, or check through the client portal — with the balance tied to project milestones. You do not need an architect's drawings to begin; we work from a napkin sketch or pick up an architect's earlier design.
Can you tell me what my project will cost to build, not just to draw?
We don't quote construction costs — that's your general contractor's bid, and it depends on finishes, site conditions, and the current local labor and material market. We design to a clear, complete scope so your GC can price it tightly with fewer surprises, and we can connect you with GC partners for a build estimate.
MEP 协调



