Commissary / Ghost Kitchen / Catering Conversion Inspection Manual

CUISINE-SPECIFIC LANDMINE

Pickup-door logistics + loading layout + per-tenant separation drive a wholly different code path.

EN + ES · free · link by email

One email with the link. We don’t sell your address; you can unsubscribe with one click.

WHERE THIS CUISINE QUIETLY COSTS YOU MONEY

Commissary / Ghost Kitchen / Catering-specific conversion gotchas

  • 01 · Driver-pickup vestibule + queue

    A multi-brand ghost kitchen at lunch peak can see dozens of drivers, so plan a separate pickup vestibule (200–400 sq ft is typical) with heated/cooled bagging shelves, a driver-ID screen, and one-way flow that doesn't cross prep. With one front door, drivers and staff share a single path — check exits and occupant load with the city early.

  • 02 · Per-tenant separation

    Health departments differ on multi-tenant kitchens: if each brand operator holds its own food permit, expect to be asked for its own 3-compartment sink, hand sink and storage, so ask the health department whether tenants may share before you lay out stations. Plan 6–8 ft of plumbing rough-in per tenant station (typically $8K–$15K per slot).

  • 03 · Loading dock + commissary deliveries

    A commissary runs 3–5 deliveries/day (produce, dairy, dry goods, paper). Without a dedicated loading dock or door-side staging area, deliveries cross the kitchen at the same time orders go out. Plan a 200–300 sq ft receiving zone with floor scale, fridge staging shelving, and a separate dock door.

  • 04 · Pack-station + insulated-bag inventory

    Catering and delivery require a pack zone with 8–12 ft of stainless table, label printer, sealable container storage, and 50+ insulated delivery bags ready at peak. Inherited spaces always under-allocate this — orders pile up at the expo line and food cools. Spec the pack zone equal in size to the cook line.

  • 05 · POS + tablet aggregator stack

    Ghost kitchens run 4–8 third-party aggregator tablets (Uber Eats, DoorDash, Grubhub, brand-direct, etc.). Each needs a 120V outlet, a network drop, and tablet-arm wall mount. Plan a tablet wall behind the expo line with dedicated outlets and structured cabling — pulling cables after the wall is finished is often a $3K rework.

Five immediate stop signals

These cancel any deal regardless of cuisine.

  • You smell gas, see burnt wiring, or see blackened / charred hood areas.

  • The exhaust fan is missing, disconnected, or shaking violently.

  • The seller refuses to provide hood / fire / grease records.

  • You must add major cooking equipment outside the existing hood.

  • The landlord will not allow roof, gas, electrical, or grease-interceptor work.

Universal walkthrough — four phases
  1. WALK

    Smell, look, listen

  2. PROVE

    Hood · gas · electrical · plumbing

  3. PRICE

    Written scopes before signing

  4. NEGOTIATE

    Or walk away

Defined terms in this guide

The vocabulary worth knowing before you sign.

Authority Having Jurisdiction· AHJ
The local government body that issues building permits and enforces code in a specific jurisdiction — typically the city building department; the fire marshal and health department are AHJs for their parts.
Americans with Disabilities Act· ADA
Federal civil-rights law requiring accessible design in public accommodations; its design rules are the 2010 ADA Standards. Building departments separately enforce accessibility through IBC Chapter 11 / ICC A117.1 (California: CBC Chapter 11B).
Occupant Load
The IBC-prescribed maximum number of people permitted in a space. Calculated by dividing floor area by the factor in IBC Table 1004.5 — 15 net sq ft per person at tables and chairs, 7 for chairs only, 5 for standing space.
Indirect Waste
A drain that discharges to a floor sink with an air gap (not a direct connection to the sewer). Required for ice machines, food-prep sinks, and most refrigeration condensate lines.
Capture Velocity
The air speed needed at the hood edge to pull in rising cooking effluent. Codes set no single capture-velocity number: unlisted hoods use the mechanical code’s minimum CFM per linear foot (IMC 507), listed hoods their listed airflow, and a capture-and-containment test confirms it.

Already walking the space?

After your field findings come the permit drawings. We don’t take restaurant jobs ourselves — send us the address and we’ll refer you to a registered architect. We reply within one business day.

Contact

Begin a project.

Studio

Phoenix4435 E Chandler Blvd · Suite 200

Servicios disponibles en español · 中文版本 (602) 628-1231

Commissary / Ghost Kitchen / Catering Restaurant Conversion Manual · Archipartners Design