Skip to main content
All cuisines10 / 20

CUISINE-SPECIFIC FIELD GUIDE

Sushi / Poke / Ramen Conversion Inspection Manual

CUISINE-SPECIFIC LANDMINE

Cold-side sanitation + dedicated rice & seafood prep zones drive a different floor plan than hot lines.

EN + ES · free · link by email

One email with the link. We don’t sell your address; you can unsubscribe with one click.

WHERE THIS CUISINE QUIETLY COSTS YOU MONEY

Sushi / Poke / Ramen-specific conversion gotchas

  • 01 · Raw-fish handling + temperature mapping

    FDA Food Code §3-402.11 requires parasite destruction for fish served raw or undercooked — -4°F or below for 7 days, or -31°F (frozen solid) for 15 hours — except exempt species such as certain tunas, qualifying farmed fish and molluscan shellfish. A standard 0°F walk-in doesn't qualify, so spec a freezer that meets those numbers (about $8K for a blast freezer) or keep the supplier's written freezing statement (§3-402.12) for the health department.

  • 02 · Sushi-rice + dedicated prep zone

    Sushi rice held unrefrigerated at the bar must be acidified (pH below 4.2) under a health-department variance and HACCP plan, or held under time as a public health control (up to 4 hours) with written procedures (FDA Food Code §3-502.11, §3-501.19). That calls for a dedicated rice prep + holding zone with logs, physically separated from a hot ramen line, where condensation and cross-contamination become inspection findings.

  • 03 · Ramen broth hood capacity

    Tonkotsu broth simmers a 60-gallon pot for 12–18 hours. The steam, fat aerosol, and protein vapors are a heavy Type I hood load — different from short-duration sauté. Inherited hoods sized for a sandwich grill miss the latent-heat load and the dining room turns into a sauna. Spec hood + MUA to the longest cook, not the average.

  • 04 · Sushi-bar plumbing + ADA

    A sushi bar typically has hand sinks at both ends of the chef line — health codes require hand sinks placed for convenient use where food is prepared (FDA Food Code §5-204.11) — plus refrigerated wells in front. Counter height must include an ADA-accessible section (5% of seating min 1). Retrofitting an inherited diner counter loses the entire sushi-bar aesthetic — design clearance + plumbing from scratch.

  • 05 · Poke-bowl cold-pan flow

    Poke is a make-line of 12–20 cold ingredient wells, like a sandwich shop in reverse. Each well must keep food at 41°F or below (FDA Food Code §3-501.16), and the refrigerated line should be certified to NSF/ANSI 7. Inherited prep tables rarely hit this; plan a refrigerated bain-marie line (typically $8K–$15K) sized to your menu width, not retrofitting cold pans into a hot-line make-table.

Five immediate stop signals

These cancel any deal regardless of cuisine.

  • You smell gas, see burnt wiring, or see blackened / charred hood areas.

  • The exhaust fan is missing, disconnected, or shaking violently.

  • The seller refuses to provide hood / fire / grease records.

  • You must add major cooking equipment outside the existing hood.

  • The landlord will not allow roof, gas, electrical, or grease-interceptor work.

Universal walkthrough — four phases
  1. WALK

    Smell, look, listen

  2. PROVE

    Hood · gas · electrical · plumbing

  3. PRICE

    Written scopes before signing

  4. NEGOTIATE

    Or walk away

Defined terms in this guide

The vocabulary worth knowing before you sign.

Indirect Waste
A drain that discharges to a floor sink with an air gap (not a direct connection to the sewer). Required for ice machines, food-prep sinks, and most refrigeration condensate lines.
Floor Drain
A floor-level drain typically required under hood, sink, and ice-machine areas. The plumbing code sets a 2-inch minimum outlet; high-flow areas often get 3-inch.
Type I Hood
A grease-rated commercial hood with grease filters and a fire-suppression system, built of steel or stainless steel. The mechanical code requires one where appliances produce grease or smoke (IMC 507; UMC Chapter 5); NFPA 96 sets matching hood, duct and suppression rules.
Capture Velocity
The air speed needed at the hood edge to pull in rising cooking effluent. Codes set no single capture-velocity number: unlisted hoods use the mechanical code’s minimum CFM per linear foot (IMC 507), listed hoods their listed airflow, and a capture-and-containment test confirms it.
Americans with Disabilities Act· ADA
Federal civil-rights law requiring accessible design in public accommodations; its design rules are the 2010 ADA Standards. Building departments separately enforce accessibility through IBC Chapter 11 / ICC A117.1 (California: CBC Chapter 11B).

Already walking the space?

After your field findings come the permit drawings. We don’t take restaurant jobs ourselves — send us the address and we’ll refer you to a registered architect. We reply within one business day.

Contact

Begin a project.

Studio

Phoenix4435 E Chandler Blvd · Suite 200

Servicios disponibles en español · 中文版本 (602) 628-1231

Sushi / Poke / Ramen Restaurant Conversion Manual · Archipartners Design