Skip to main content
Ray Luzuriaga

Drafter

Ray Luzuriaga

The set is done when there's nothing left to explain.

Ray is a drafter at APD. He builds permit-ready sets the careful way — every dimension checked against the next, every callout traced back to the code section that requires it.

He treats a drawing set as a set of promises: the contractor can build from it without guessing. Getting there is patience, sheet by sheet.

Field notes

The little things Ray keeps on the bench.

  1. How I work

    One sheet at a time — and I don't leave a sheet until it agrees with every other sheet in the set.

  2. What plan check taught me

    The corrections you get twice are the ones you stopped checking for. So I keep a list, and I never stop checking.

  3. The boring part that matters

    Dimensions and notes. A clean plan with a missing dimension is an RFI waiting to happen.

  4. The standard

    Draw it so the field never has to guess.

Have a project that fits Ray's lane?

Tell us what you're building. We'll get Ray on the call.

Work with Ray →
Ray Luzuriaga — Drafter · Archipartners Design