自助餐 / 火锅 / 大型餐厅 转换检查手册

该菜系特有的雷区

Per-table induction or gas runs change the entire MEP and finish package.

英文 + 西班牙文 · 免费 · 邮件发送链接

一封包含链接的邮件。我们不出售您的地址,您可一键取消订阅。

该菜系常见的烧钱点

自助餐 / 火锅 / 大型餐厅 特有的转换难点

  • 01 · Per-table induction electrical load

    A hot-pot table with 2 induction zones at 1,800W each = 3,600W per table. A 40-seat dining room at 2 seats/table = 72 kW of induction-only load, separate from kitchen + HVAC + lighting. That requires service upgrade or sub-panels routed through the floor — typically $20K–$60K depending on existing service capacity.

  • 02 · Per-table exhaust + downdraft

    Tabletop grills (Korean BBQ) need exhaust at every table — overhead hoods, or downdraft systems listed for the purpose (IMC §507.1; NFPA 96) — plus grease ducts, an exhaust fan and make-up air; downdraft ducts run under the floor and suit slab-on-grade, while overhead hoods avoid cutting an upper-floor slab. Hot-pot tables (boiling broth) mostly add steam and heat, so ask the city whether it wants table exhaust or lets the HVAC design carry that load (IMC §507.3).

  • 03 · Buffet line sneeze-guards + temperature

    The FDA Food Code requires food on display to be protected by food guards (sneeze guards), display cases or other effective means (§3-306.11), with hot holding at 135°F or above and cold holding at 41°F or below (§3-501.16). Inherited cafeteria tables rarely hold those temperatures, so spec NSF-certified hot/cold wells with built-in thermometers, not standalone chafers + ice.

  • 04 · Dish-room scale + 3-comp sink size

    A 150-seat buffet can push 1,500+ dishes per service, which takes a flight-type or rack-conveyor dishwasher (not a single-rack undercounter) with three-phase power and a booster heater sized from the machine's spec sheet. Add a 3-compartment sink for pots (FDA Food Code §4-301.12) and room to match — about 200 sq ft is typical, and inherited dishrooms are often undersized.

  • 05 · HVAC for large dining + per-zone control

    A 150-seat dining room with active hot-pot tables generates massive sensible + latent load. A single-zone rooftop unit cannot follow variable occupancy (slow lunch vs packed dinner). Plan 3–5 separate zones (e.g., VAV boxes), typically $25K–$50K, versus the call-backs from a one-zone system that runs cold in corners and hot at the entry.

五个立即停止的信号

不论何种菜系,这些都会让交易作废。

  • 闻到燃气、看到烧焦的电线,或排烟罩区域有焦黑。

  • 排风扇缺失、断开,或剧烈震动。

  • 卖家拒绝提供排烟罩 / 消防 / 油脂的服务记录。

  • 必须在现有排烟罩之外增加大型烹饪设备。

  • 房东不允许屋顶、燃气、电力或油脂截留装置作业。

通用考察流程 — 四个阶段
  1. 考察

    闻 · 看 · 听

  2. 验证

    排风 · 燃气 · 电力 · 管道

  3. 报价

    签约前要书面方案

  4. 谈判

    或转身离开

已经在考察场地?

现场结论之后是申报图纸。我们不承接餐厅项目 — 把地址发给我们,我们会为您转介注册建筑师。我们在一个工作日内回复。