跳到主内容
所有菜系01 / 20

菜系专属现场指南

中餐 / 锅炒 转换检查手册

该菜系特有的雷区

High-BTU wok ranges need real make-up air and a Type I hood with proven capture.

英文 + 西班牙文 · PDF + DOCX · 邮件发送

一封包含下载链接的邮件。我们不出售您的地址,您可一键取消订阅。

该菜系常见的烧钱点

中餐 / 锅炒 特有的转换难点

  • 01 · Wok-range BTU load

    A single 16" wok burner runs 100,000–150,000 BTU; a four-burner Chinese range commonly hits 600,000+ BTU. The hood, exhaust fan, and gas service in the previous tenant's set-up almost certainly weren't sized for that. Confirm hood CFM, exhaust duct size, and gas-meter capacity BEFORE signing.

  • 02 · Make-up air sizing

    For every CFM the hood exhausts, you need a matching CFM coming in — typically 80–85% of exhaust as a dedicated tempered MUA unit. A 4,000 CFM wok hood with no MUA pulls negative pressure through the front door, slams it, and chases customers out. MUA is often an extra $8K–$15K conversion line item.

  • 03 · Stainless wall behind the wok

    Code (and insurance) require non-combustible wall + ceiling surfaces within ~36" of any wok burner. Drywall behind the previous tenant's pizza oven won't pass — budget for stainless sheet or fire-rated tile across the whole back wall.

  • 04 · Wok-water drainage

    Wok stations use a constant cool-water spray to keep the ring temperature down — that water has to go somewhere. Most wok ranges ship with a built-in 2" floor drain requirement. If the existing slab doesn't have a drain in the right spot, you're saw-cutting concrete (~$3K–$8K + permit).

  • 05 · Grease load + interceptor sizing

    Wok cooking generates 2–3× the grease load of grill or sauté. The previous tenant's grease interceptor was probably sized for that operation, not a wok line. Many AHJs require resizing under IPC Section 1003 — expect a 1,000+ gallon interceptor + a pump-out frequency increase from quarterly to monthly.

五个立即停止的信号

不论何种菜系,这些都会让交易作废。

  • 闻到燃气、看到烧焦的电线,或排烟罩区域有焦黑。

  • 排风扇缺失、断开,或剧烈震动。

  • 卖家拒绝提供排烟罩 / 消防 / 油脂的服务记录。

  • 必须在现有排烟罩之外增加大型烹饪设备。

  • 房东不允许屋顶、燃气、电力或油脂截留装置作业。

通用考察流程 — 四个阶段
  1. 考察

    闻 · 看 · 听

  2. 验证

    排风 · 燃气 · 电力 · 管道

  3. 报价

    签约前要书面方案

  4. 谈判

    或转身离开

已经在考察场地?

现场结论之后是申报图纸。APD 绘制合规、可让承包商报价、足够快的图纸,以保住交易 — 覆盖美国 50 州,三语 EN / ES / 中。

联系

开始一个项目。

工作室

Phoenix4435 E Chandler Blvd · Suite 200

提供英语 · 西班牙语 · 中文服务。 (602) 628-1231

中餐 / 锅炒 餐厅转换检查手册 · Archipartners Design