Skip to main content
All cuisines08 / 20

CUISINE-SPECIFIC FIELD GUIDE

Indian / South Asian Conversion Inspection Manual

CUISINE-SPECIFIC LANDMINE

Tandoor ovens have unique clearance + venting rules most inherited hoods don’t satisfy.

EN + ES · free · link by email

One email with the link. We don’t sell your address; you can unsubscribe with one click.

WHERE THIS CUISINE QUIETLY COSTS YOU MONEY

Indian / South Asian-specific conversion gotchas

  • 01 · Tandoor heat output + clearance

    A charcoal tandoor reaches 900°F+ inside and radiates hard; as a solid-fuel appliance under NFPA 96 it must sit on a noncombustible floor extending 3 ft in all directions unless listed for less, and its listing sets wall clearances (NFPA 96's 18" rule is for the hood and duct). Most inherited back walls are drywall + paint, a fire-marshal red-line: plan stainless or fire-rated board behind every tandoor.

  • 02 · Tandoor venting + solid-fuel hood

    A charcoal tandoor is solid fuel and needs the same treatment as a wood-burning smoker: its own hood and exhaust with spark arresters, never tied into the curry-line gas hood (NFPA 96 and IMC 507 require solid-fuel exhaust to be separate). Gas tandoors run hot too, so size the hood over them for that load.

  • 03 · Curry-spice aroma penetration

    Long-simmer curries put aromatic oils into HVAC return air, drywall, and ceiling tile. After 18 months an inherited space smells permanently of fenugreek and turmeric. Plan independent exhaust for the curry line (no shared return air with the dining room) and budget about $4K–$8K to replace any porous ceiling at lease end.

  • 04 · Dosa griddle + flat-top sizing

    A South Indian dosa griddle is 30"–48" round and runs at 450°F. Tandem with the tandoor and curry line, that's three high-heat appliances in one zone — usually 250K–400K BTU concentrated on 8' of line. Most inherited 4' hoods don't span the load; plan continuous hood coverage for the gas line (dosa griddle + curry range) and a separate hood and exhaust for a charcoal tandoor — not a stitched-together combo.

  • 05 · Vegetarian + non-veg separation

    Many Indian operators serve a strict-vegetarian segment and need physically separated prep surfaces, utensils, and walk-in shelving from non-veg lines. Inherited spaces with one combined prep area force a rework: add a second small walk-in or a fully partitioned prep zone (~$10K–$20K). This is a brand-trust issue, not just an operational one.

Five immediate stop signals

These cancel any deal regardless of cuisine.

  • You smell gas, see burnt wiring, or see blackened / charred hood areas.

  • The exhaust fan is missing, disconnected, or shaking violently.

  • The seller refuses to provide hood / fire / grease records.

  • You must add major cooking equipment outside the existing hood.

  • The landlord will not allow roof, gas, electrical, or grease-interceptor work.

Universal walkthrough — four phases
  1. WALK

    Smell, look, listen

  2. PROVE

    Hood · gas · electrical · plumbing

  3. PRICE

    Written scopes before signing

  4. NEGOTIATE

    Or walk away

Defined terms in this guide

The vocabulary worth knowing before you sign.

Type I Hood
A grease-rated commercial hood with grease filters and a fire-suppression system, built of steel or stainless steel. The mechanical code requires one where appliances produce grease or smoke (IMC 507; UMC Chapter 5); NFPA 96 sets matching hood, duct and suppression rules.
Ember Collector
A baffle or screen assembly in a solid-fuel hood, ahead of the grease filters, that stops sparks and embers — what NFPA 96 calls a spark arrester.
Make-Up Air· MUA
Outside air brought in to replace what the hood exhausts. The mechanical code requires make-up air roughly equal to the exhaust (IMC 508.1); a dedicated, tempered unit typically supplies most of it, the rest transferred from the dining room.
NFPA 96
NFPA’s Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations — the national standard behind most hood, grease-duct and kitchen fire-suppression rules.
BTU (British Thermal Unit)· BTU
A unit of heat. Gas cooking appliances are rated by input in BTU per hour (BTU/h): a home burner is roughly 12,000 BTU/h; a commercial wok burner typically 100,000–150,000 BTU/h.

Already walking the space?

After your field findings come the permit drawings. We don’t take restaurant jobs ourselves — send us the address and we’ll refer you to a registered architect. We reply within one business day.

Contact

Begin a project.

Studio

Phoenix4435 E Chandler Blvd · Suite 200

Servicios disponibles en español · 中文版本 (602) 628-1231

Indian / South Asian Restaurant Conversion Manual · Archipartners Design